How to Build a Construction Unit Price Analysis (UPA) in 2026: From Static Spreadsheets to AI Dynamic Control
Complete mathematical breakdown of the 4 direct cost pillars: materials with waste factors, fully burdened crew labor rates, equipment, and hauling logistics. Step-by-step structural wall calculation.